Skip to content
Mechanical Inspection

LNG Preconditioning Plant — Auxiliary Gearbox Inspection

Auxiliary gearbox inspection for ADNOC LNG preconditioning plant

Project Overview

DualTech Conseil carried out the inspection of an auxiliary gearbox (GT) — S/N 17877, Type DF51BB — for the ADNOC GAS LNG Preconditioning Plant (LPP) project. The gearbox is a critical component in the gas turbine auxiliary drive system.

Scope of Inspection

  • Visual and dimensional inspection of the gearbox housing
  • Tooth contact pattern verification on gear pairs
  • Backlash measurement on all gear meshes
  • Non-destructive testing (NDT) on welds and critical sections
  • Dimensional verification of shaft alignment
  • Documentation review (material certificates, ITP)

Standards Applied

API 613 — Special-purpose gear units for petroleum, chemical and gas industry services.

Deliverables

Inspection report with dimensional data sheets, tooth contact pattern photos, NDT results, and final release recommendation.

Related Projects

More Projects Like This

Similar inspection assignments from our portfolio.

View all projects

Need an inspection like this?

Send us your scope, equipment and location — we will propose the right inspector.

Request Inspection