Mechanical Inspection

LNG Preconditioning Plant — Gear Unit Inspection

Gear unit inspection with CMM for LNG preconditioning plant

Project Overview

DualTech Conseil carried out the inspection of a critical gear unit with open housing for the ADNOC GAS LNG Preconditioning Plant (LPP) project. The gear unit — an agitator drive — required precise verification of tooth mesh contact, backlash and axial stability due to its critical role in the LNG production chain.

Scope of Inspection

  • Tooth mesh contact pattern verification
  • Backlash measurement using precision instruments
  • Axial stability check
  • Dimensional verification with ZEISS coordinate measuring machine (CMM)
  • Material and surface hardness checks
  • Documentation review (material certificates, machining records)

Approach

Our inspector worked alongside the vendor’s engineering team at the manufacturing facility in France. Using coordinate measuring machines (CMM) and precision metrology tools, each critical dimension was validated against the design specification before final assembly.

Deliverables

Detailed inspection report with dimensional data sheets, CMM measurement records, photo documentation, and a final release recommendation.

Related Projects

More Projects Like This

Similar inspection assignments from our portfolio.

View all projects

Need an inspection like this?

Send us your scope, equipment and location — we will propose the right inspector.

Request Inspection